IATF 16949:2016Manufacture of metal fastenersMulti-station cold headingFormed geometry and secondary featuresMade to your drawingRequirements confirmed by project
A CLOSER LOOK AT OUR 206 EQUIPMENT

Heavy-duty cold heading.
Real equipment. Real detail.

Explore AJEAP's existing 206 equipment through the complete machine, the operating environment and the forming-tooling detail.

Share the material, geometry and quantity so the suitable forming route and secondary requirements can be reviewed for your part.

206EXISTING EQUIPMENT
257PLANNED ADDITION

Future details after arrival, installation and validation.

Review a part for our 206 equipment
AJEAP 206 cold-heading equipment, complete machine
206 · Complete machine
AJEAP 206 forming-tooling detail
206 · Forming-tooling detail
AJEAP 206 equipment operating environment
206 · Operating environment
START WITH A FAMILIAR GEOMETRY

Can we make a part like yours?

Explore representative parts, then tell us which features and requirements matter for your project.

MANUFACTURING FIT

From formed geometry
to the finished requirement.

The drawing defines the route. Review the process, then share your material, features and expected quantity.

Manufacturing focusHow to evaluate the fitNext step
Multi-station cold headingInclude the material, part geometry, critical dimensions and expected quantity.Explore capability ↗
Threading and secondary operationsIdentify the features requiring secondary machining, the datums, tolerances and finish.Explore capability ↗
Inspection and sortingShare the required checks, sampling, acceptance criteria and documentation.Explore capability ↗

Machining features, tolerances, tooling needs and delivery timing are confirmed for the individual project.

QUALITY YOU CAN REVIEW

See the system.
Discuss the critical features.

Automotive fasteners need a clear inspection plan. Review our manufacturing certification and discuss the dimensional, material and documentation requirements for your part.

IATF 16949:2016Scope: manufacture of metal fasteners
Certificate valid until 08 March 2028
3D inspection system photographed for AJEAP
3D first-article inspection · Part requirements define the inspection scope.
WORKING WITH AJEAP

Know what happens
before you commit.

01

Define the requirement

Drawing revision, application, material and quantity.

02

Review the route

Forming, secondary operations and critical characteristics.

03

Agree the project scope

Tooling, samples, checks and timing to be confirmed for the part.

04

Validate before production

Confirm requirements and sample approval arrangements.

PRODUCT PORTFOLIO

Find the closest starting point.

Representative examples of drawing-based parts, with no fixed stock specification implied.

Browse all component families ↗
START WITH YOUR PART

Ready to share a drawing?
Or still defining the part?

Prepare an enquiry with your files, or describe what you need. Include the material, quantity and critical requirements where known.

Send your drawing ↗